- Joined
- Oct 22, 2007
- Messages
- 2,798
I have a 1485 sf house built in 1978 under AFS contract in Sherwood Park, and I'm debating whether to assign it.
$5k down (plus assignment fee) and taking over payments on a 4 year term. Would cashflow as an RTO, but tricky as a rental. Closing July 7th. Can begin marketing and showing now.
Needs a few things done: laminate in living, dining, and hall; 3 windows should be replaced, HWT, 3 closet doors, 3 bedroom doors, 2 vanities, and the basement bathroom shower is leaking so the shower and wall need attention. Big, ground level deck is starting to rot and should be ripped up and grading improved (but no need to reinstall deck). My contractor has the details and can draft a quote.
I have professional inspection and am awaiting appraisal results. I'd be happy to share both with any interested party.
[email protected]
$5k down (plus assignment fee) and taking over payments on a 4 year term. Would cashflow as an RTO, but tricky as a rental. Closing July 7th. Can begin marketing and showing now.
Needs a few things done: laminate in living, dining, and hall; 3 windows should be replaced, HWT, 3 closet doors, 3 bedroom doors, 2 vanities, and the basement bathroom shower is leaking so the shower and wall need attention. Big, ground level deck is starting to rot and should be ripped up and grading improved (but no need to reinstall deck). My contractor has the details and can draft a quote.
I have professional inspection and am awaiting appraisal results. I'd be happy to share both with any interested party.
[email protected]