Putting a bid on a rundown home and wanted to know what other conditions might be appropriate. The water is shut off and so is the power to the home. Planning to take it over within 30 days.
The electrical will be upgraded with the reno, as will most of the house (window,siding,roof, interrior floors, kitchen etc.), so I am thinking the main condition would be my ability to get appropriate building permits. I`d probably keep the electrical off till I replace the panel and wiring.
Anything else I might want to consider specific to the property. I`ve had the building inspected already.
Tks
Tony
The electrical will be upgraded with the reno, as will most of the house (window,siding,roof, interrior floors, kitchen etc.), so I am thinking the main condition would be my ability to get appropriate building permits. I`d probably keep the electrical off till I replace the panel and wiring.
Anything else I might want to consider specific to the property. I`ve had the building inspected already.
Tks
Tony