- Joined
- Jul 12, 2016
- Messages
- 67
After digging the basement down 30 inches, gutting all framing, repointing the exterior stone, reframing the entire building, adding a full loft space with 8' ceiling, stone patio, cedar pergola, covered porch, new sanitary sewer main to the street, we are FINALLY approaching the point where we can drywall the inside, and get on with the best part, FINISHES!!!
WATCH & SUBSCRIBE!!!:
WATCH & SUBSCRIBE!!!: